Im about half way through my first moho project, and I'm wondering if there are ways to make things easier. My project is about 2 mins long, and at a frame rate of 24 thats a few thousand frames. I want to scrub through my project to check and make minor corrections.. so I'm wondering if there is a way to resize the timeline so that more than just 72 frames fit on at one time (I can only scrub through 3 secs at a time). Also, is there a way to export the whole project to a file that will copy over all the media Ive used (image files). This way I can take that file to another computer and not have missing links. Does moho require you set this all up in advance, or can it find the files and export them all together (like I do in FCP)?
Ill post my project in the shareyour work when its finished!
Thanks!
resizing timeline
Moderators: Víctor Paredes, Belgarath, slowtiger